Harvard Sees Completion of New Science Complex

Harvard University recently saw construction finish on its new Science and Engineering Complex (SEC), located across the Charles River from its main campus in Cambridge, Mass. The complex, designed by Behnisch Architekten, is set to open to students in fall 2021. The eight-story structure covers more than 540,000 square feet and features classrooms, laboratories, collaboration spaces, and more designed to foster interdisciplinary study.

The newest addition to the Allston campus offers street-level makerspaces and teaching labs visible to passersby, increasing engagement with the local community. The lower floors offer classrooms, teaching labs, and amenity spaces—some of which function as fixed-seating classrooms, while others are active-learning spaces designed to allow a wider variety of layouts and activities. The facility will serve as the home to a large part of Harvard’s John A. Paulson School of Engineering and Applied Science (SEAS) and welcome researchers and students in fields including robotics, computer science, electrical and mechanical engineering, bioengineering, materials science, and more.

The facility’s upper floors will feature almost 70,000 square feet of wet research lab space for biology, chemistry, physics, optics, and electronics classes and research, as well as about 24,000 square feet of dry research labs for computer science. Flexible lab environments leave room to repurpose various spaces later on as needs change.

The team from Behnisch Architekten, tasked with making the SEC the “healthiest building on the Harvard campus,” created a design that garnered LEED Platinum and Living Building Challenge Petal certifications in Materials, Beauty, and Equity. Materials used are free of a specific set of harmful chemicals, comply with the LBC Red List, and conform to the standards of Harvard’s Healthier Building Academy.

The building contains the world’s first hydroformed tensile façade system, reducing solar heat from glazed daylighting openings and using high-comfort radiant systems for indoor climate control. Its water-based heating and cooling systems use one-third of the energy of air-driven systems. The two fast, daylit atria and interior partitions reflect daylight deep into the building’s interior. It also features five acres of roof terraces with vegetation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.