Voltek Featured on “The Build Show” Video Series

Low voltage power solutions company Voltek Systems Inc. was featured in a recent episode of the popular home remodeling YouTube series "The Build Show." Host Matt Risinger, a contractor who specializes in architect-driven and fine craftmanship work, discussed the installation of low-voltage wired and powered USB outlets that can power devices like smartphones and laptops without the use of a bulky charging brick. The outlets provide input ports for both USB-A and USB-C cables.

A centrally mounted Voltek Rack Mount Power Supply unit converts 110-volt power into DC, which is distributed up to 1,000 feet through a low voltage cable to each outlet. One unit can provide power for up to 12 USB outlets installed throughout a facility. Outlets wired to the central rack mount can be placed anywhere in a building for easy charging capabilities without excess equipment. The rack-mounted power supply unit can also be attached to a battery backup to run for hours in the event of a power outage.

Wall-mounted USB outlets have grown in popularity in spaces like huddle areas, classrooms, study rooms, residence halls, and offices, as they offer the ability to charge a device conveniently and discreetly.

Voltek’s primary focus has been on the K–12 and Higher Education spaces, where laptops have become the norm for the teaching environment.  Nearly every model of laptop now charges over a USB-C connection, and the Voltek system provides the ability to charge these without the need for the AC-to-DC conversion brick. Voltek also aims to keep the laptop charging while the device is in use, as opposed to the student having to dock it on a charge cart and remove it from the learning environment during the interim.

Installation of Voltek outlets doesn’t require a licensed electrician, and they can easily be deployed as a retrofit in learning environments lacking electrical outlets. Additionally, they offer a significant cost savings over traditional 110 AC outlets when installed in a new construction project. Providing only low voltage power at the outlet, they are also safer due to no risk of electrical shock.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition