MaxLite Releases LED Flat Panels Featuring Customization Options

This week, lighting solutions company MaxLite announced the launch of its FlatMax LED Flat Panels featuring field-installable controls as well as field-selectable CCT (color-correlated temperatures) and wattages. The panels serve as a flexible, future-ready product for schools, offices, healthcare facilities, and more.

The FlatMax Panels are part of a larger portfolio of lighting solutions that can be used with c-Max Lighting Controls, a new design enabling the use of luminaire-level lighting controls at the installation site. The plug-and-play interface allows the control nodes to be added at the time of installation or any time afterward. The nodes can provide energy-savings capabilities like motion sensing, daylight harvesting, bi-level dimming, and more; the control node plugs into a USB-C port on the panel’s frame and can be accessed by a remote control or an app. Emergency batter backup is also available.

FlatMax LED Flat Panels

The panels come in 2’x4’, 2’x2’, and 1’x4’ sizes and were designed to seamlessly replace existing fluorescent fixtures. All sizes feature field-selectable CCTs (choice of 3,500K, 4,000K, or 5,000K) and wattage outputs ranging between 2,000 and 5,040 lumens.

“Our new generation of FlatMax Panels delivers all the benefits of LED technology with the flexibility to adjust light levels and color temperatures in the field and add lighting controls at any time,” said MaxLite director of product management Ramesh Raghavan. “Covering so many lighting applications in a single SKU greatly simplifies the decision-making process for the distributor, contractor and end-user.”

The complete specifications for FlatMax Flat Panels are available here. More information about the patent-pending c-Max lighting controls is available here.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.