Campbellsville University Broadcast Studio Gets LynTec Power Control System

Campbellsville University in Campbellsville, Ky., has partnered with JCA Media to select LynTec, an electrical power control solutions manufacturer for professional audio, video and lighting (AVL) systems, to supply products for the university’s broadcast studios. Integration firm JCA Media has already installed LynTec’s lighting control panels in other buildings around campus. With these previous experiences in mind, the firm installed LynTec’s Remote Control Braker Panel as a user-friendly, circuit-level zoned control mechanism in the university’s mass communication’s center’s television broadcast studios.

“We consistently use the company’s LCRP retrofit boxes for churches that are changing out their old-school dimming systems to LED, where they need to be able to have DMX relays to turn off their circuits,” said Alex Peake, JCA Media integration specialist. “LynTec has always been a great solution for us. It’s 100 percent reliable, and they have great customer support that always takes the time to walk me through any questions I might have. It was the perfect answer for the university’s TV studio.”

LynTec Power Control System
JCA Media Selected LynTec Panels to Power Broadcast Studio.

The single-panel RPC features the flexibility to work with a number of control platforms like DMX, HTTP, Telnet, sACN, RS-232, and BacNET. It offers features like circuit protection, power management, on/off control, and power sequencing. The RPC is programmed for three zones, consisting of the two studios and the control room. It provides protection from brownout as well as over- and under-voltage protection, sends notifications, and enables remote monitoring.

“The ability for broadcast teams to go live at any time depends on the seamless control and power protection of their AVL systems,” said LynTec president Mark Bishop. “The installation at Campbellsville University, under the guidance of JCA Media, illustrates how our RPC panel provides invaluable control and protection that improves the performance and lifespan of their AVL systems and fits right into any production workflow.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • i-PRO, NovoTrax Partner for New School Emergency Response Solution

    i-PRO Americas, Inc., which manufactures edge computing cameras, recently announced a partnership with NovoTrax, provider of end-to-end life safety and mass notification solutions, to address gaps in emergency response workflows at K–12 schools, according to a news release.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition