Indiana School Buses to Get UV Air Purification, Filtration Systems

This week, the Indiana State School Bus Committee approved the installation of ultraviolet light air purification systems on school buses statewide. The decision became final after the success of a trial program run in partnership with indoor air quality solutions provider Lumin-Air.

“This approval is very exciting for Indiana school districts and puts Indiana on par with other states who have already approved these technologies to help provide clean air in their school buses,” said Andrew Desmarais, Lumin-Air’s Chief Operating Officer. “Most importantly, Indiana schools can now implement a solution to help reduce the risk of transmission and better protect students, bus drivers and other school bus occupants against airborne respiratory pathogens like SARS-CoV-2 and Influenza.”

The system features enclosed MERV-13 filtration and UV lights, a more effective method of air cleansing than opening windows—especially in a densely populated environment like a bus. The U.S. Environmental Protection Agency (EPA) has issued warnings about the dangers of inhaling exhaust and other outdoor pollutants like allergens.

The decision also comes ahead of the June 25 deadline for Indiana schools to submit proposals as to how they will portion out their Elementary and Secondary School Emergency Relief (ESSER) funding.

“If a school system spent a little over 1 percent of their ESSER funding on air quality in their school buses, they could have systems installed, including 12 years of replacement filters and UV bulbs, addressing the neediest portion of their facilities,” said Dan Fillenwarth, President of Lumin-Air. “This would be a huge step toward improving the health of students, teachers and bus drivers, and helping to protect schools from shutting down in the future.”

Lumin-Air has previously installed similar solutions in California, Florida, Maryland and Pennsylvania in both school and public buses.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition