MasterLibrary Announces Interactive Floor Plan Tool

Facility management application solutions provider MasterLibrary recently added a new product to its collection of K–12 solutions. ML Drawings, an interactive floor plan tool, lets users add building assets represented by digital icon stamps to digital floor plans of educational facilities. Each stamp contains further information about the asset being placed.

“We are excited about the launch of ML Drawings and the capabilities it now gives facility professionals,” said Tom Rauscher, MasterLibrary President. “For our users to easily create a digital version of their building through the use of ML Drawings, it will make it easier for the facility departments to view their assets and be more efficient at maintaining them.”

Facility professionals can either map the building’s assets themselves or allow third-party contractors to use ML Drawings during survey work. Other capabilities include two-way integration with ML Work Orders, MasterLibrary’s work order system. Users can schedule work orders or preventative maintenance straight through the asset stamp, as well as access further information about that specific asset.

ML Drawings was released on April 26, 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • Midland ISD Starts Construction on Two New High Schools

    The Midland Independent School District recently announced that it will break ground on two new high schools in Midland, Texas, according to a news release. The district is partnering with Pfluger Architects, Lee Lewis Construction, and Satterfield & Pontikes to create a total of over 1.5 million square feet for 8,400 students in grades 9–12.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition