MasterLibrary Announces Interactive Floor Plan Tool

Facility management application solutions provider MasterLibrary recently added a new product to its collection of K–12 solutions. ML Drawings, an interactive floor plan tool, lets users add building assets represented by digital icon stamps to digital floor plans of educational facilities. Each stamp contains further information about the asset being placed.

“We are excited about the launch of ML Drawings and the capabilities it now gives facility professionals,” said Tom Rauscher, MasterLibrary President. “For our users to easily create a digital version of their building through the use of ML Drawings, it will make it easier for the facility departments to view their assets and be more efficient at maintaining them.”

Facility professionals can either map the building’s assets themselves or allow third-party contractors to use ML Drawings during survey work. Other capabilities include two-way integration with ML Work Orders, MasterLibrary’s work order system. Users can schedule work orders or preventative maintenance straight through the asset stamp, as well as access further information about that specific asset.

ML Drawings was released on April 26, 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.