MasterLibrary Announces Interactive Floor Plan Tool

Facility management application solutions provider MasterLibrary recently added a new product to its collection of K–12 solutions. ML Drawings, an interactive floor plan tool, lets users add building assets represented by digital icon stamps to digital floor plans of educational facilities. Each stamp contains further information about the asset being placed.

“We are excited about the launch of ML Drawings and the capabilities it now gives facility professionals,” said Tom Rauscher, MasterLibrary President. “For our users to easily create a digital version of their building through the use of ML Drawings, it will make it easier for the facility departments to view their assets and be more efficient at maintaining them.”

Facility professionals can either map the building’s assets themselves or allow third-party contractors to use ML Drawings during survey work. Other capabilities include two-way integration with ML Work Orders, MasterLibrary’s work order system. Users can schedule work orders or preventative maintenance straight through the asset stamp, as well as access further information about that specific asset.

ML Drawings was released on April 26, 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.