Barton Malow Builders Expand into K–12 Market

Contracting firm Barton Malow Builders announced this week that it is partnering with Orange County Public Schools in Orlando, Fla., as the construction manager on a large-scale capital improvement project. According to a press release, the Low-Voltage Systems Capital Renewal project is valued at more than $20 million and aims to replace and update fire alarms, security camera sub-systems and intercoms at about 40 schools around the district.

“Barton Malow is excited to partner with OCPS, one of the largest school districts in the nation,” said Randy Zylstra, Director of Florida Operations for Barton Malow. The partnership will also involve VoltAir Consulting Engineers and Provisions Construction & Development, two minority partner firms, in an effort to foster relationships among local businesses.

Barton Malow ranked #13 in Building Design + Construction’s 2020 list of Top K–12 Contractors, as well as #10 in the Engineering News-Record’s 2020 list of Top Education Contractors. Construction on the Capital Renewal project is scheduled to begin this fall and to finish sometime during 2022. Officials also anticipate that the project will create a substantial number of new jobs in Central Florida.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.