Mansfield Breaks Ground on State’s First Net Zero Elementary School

The town of Mansfield, Conn., broke ground last week on the state’s first net-zero elementary school. Local politicians, town administrators, parents and students attended the ceremony on Thursday, June 25. The new school, which has yet to be named, will replace the town’s three existing elementary schools.

“Mansfield will go from three elementary schools and one middle school, to one elementary school and a middle school,” said Mansfield Town Manager Ryan Aylesworth.

The school’s construction was a decade in the making, according to Aylesworth, following needs assessments, studies, and discussions with administrators. Funding was approved through a referendum held in Nov. 2020, allocating up to $50.5 million for the project. In April 2021, the Mansfield School Building Project Committee approved a bid by Newfield Construction Group LLC in Hartford, Conn., of about $36.4 million. The school is scheduled to open in time for the fall 2022 semester.

According to Jeff Brown of TSKP Studio, the project’s architect, the building will use geothermal and solar technologies to achieve its net-zero status. He noted that the building will have a tight envelope and retain as much heating and cooling as possible. Tai Soo Kim, a partner at TSKP, noted that all classrooms will face south to allow natural sunlight to reach deep into the school and reduce the need for artificial light. The windows will be equipped with sunshades to reduce heat in classrooms during hotter months.

Brown and Kim said that, in line with the commitment to sustainability, natural materials like wood will be used as much as possible.

“It’s a fitting end to a difficult year to announce the beginning of construction for such an exciting new community school,” said Mansfield Mayor Antonia Moran at the ceremony. “From a town perspective, this building meets our goals for high-quality education, sustainability and smart financial planning.”

The new school will house students ages pre-kindergarten through fourth grade. Officials say that the facility will assist with issues of aging infrastructure and declining enrollment to save money in the long term.

“This has been a learning experience for us and for our management team, especially for our architects and their engineering team,” said Mansfield School Building Committee Chairman Randy Walikonis. “However, they did create a net-zero energy building with the use of an extensive geothermal field to reduce energy needs, abundance use of solar panels, appropriate orientation of the building, creation of a tight envelope in the building and finding creative ways to bring in natural light deep into the building. And that’s quite a feat.”

The school will feature a 492-kilowatt photovoltaic array on the roof, as well as reduced air infiltration and exterior lighting motion sensors, Energy Star appliances and geothermal pump water heating, and LED lighting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.

  • Stanford Online Reveals New Immersive Learning Studio

    Stanford Online recently marked its 30th anniversary with the announcement of a new immersive learning studio, according to a university news release. The studio takes advantage of AI-powered and immersive learning technologies to continue delivering personalized and faculty-led education.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.