Mansfield Breaks Ground on State’s First Net Zero Elementary School

The town of Mansfield, Conn., broke ground last week on the state’s first net-zero elementary school. Local politicians, town administrators, parents and students attended the ceremony on Thursday, June 25. The new school, which has yet to be named, will replace the town’s three existing elementary schools.

“Mansfield will go from three elementary schools and one middle school, to one elementary school and a middle school,” said Mansfield Town Manager Ryan Aylesworth.

The school’s construction was a decade in the making, according to Aylesworth, following needs assessments, studies, and discussions with administrators. Funding was approved through a referendum held in Nov. 2020, allocating up to $50.5 million for the project. In April 2021, the Mansfield School Building Project Committee approved a bid by Newfield Construction Group LLC in Hartford, Conn., of about $36.4 million. The school is scheduled to open in time for the fall 2022 semester.

According to Jeff Brown of TSKP Studio, the project’s architect, the building will use geothermal and solar technologies to achieve its net-zero status. He noted that the building will have a tight envelope and retain as much heating and cooling as possible. Tai Soo Kim, a partner at TSKP, noted that all classrooms will face south to allow natural sunlight to reach deep into the school and reduce the need for artificial light. The windows will be equipped with sunshades to reduce heat in classrooms during hotter months.

Brown and Kim said that, in line with the commitment to sustainability, natural materials like wood will be used as much as possible.

“It’s a fitting end to a difficult year to announce the beginning of construction for such an exciting new community school,” said Mansfield Mayor Antonia Moran at the ceremony. “From a town perspective, this building meets our goals for high-quality education, sustainability and smart financial planning.”

The new school will house students ages pre-kindergarten through fourth grade. Officials say that the facility will assist with issues of aging infrastructure and declining enrollment to save money in the long term.

“This has been a learning experience for us and for our management team, especially for our architects and their engineering team,” said Mansfield School Building Committee Chairman Randy Walikonis. “However, they did create a net-zero energy building with the use of an extensive geothermal field to reduce energy needs, abundance use of solar panels, appropriate orientation of the building, creation of a tight envelope in the building and finding creative ways to bring in natural light deep into the building. And that’s quite a feat.”

The school will feature a 492-kilowatt photovoltaic array on the roof, as well as reduced air infiltration and exterior lighting motion sensors, Energy Star appliances and geothermal pump water heating, and LED lighting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.