Gonzaga University Names New Integrated Science and Engineering Facility

Gonzaga University in Spokane, Wash., announced this week that it has named its new Integrated Science and Engineering facility: The John and Joan Bollier Family Center for Integrated Science and Engineering is scheduled to open this fall. The Bollier family, from Newberg, Ore., provided a significant donation for the construction of the $49.7-million facility.

“The Bollier family exemplifies the values, commitment, and spirit of this community. John, Joan, Brett, Emily, and Nolan’s thoughtful and generous leadership makes a significant difference in ensuring the University delivers on this mission,” said Gonzaga President Thayne M. McCulloh, D.Phil. “Because of the Bolliers, Gonzaga’s commitment to Jesuit STEM education and research will have an impact on the Inland Northwest and beyond for generations to come. I am truly thankful for the support and Zag spirit with which they show up each day.”

According to a press release, in September, faculty and staff will move into their offices and common areas, study spaces and labs will open to students. Classes are scheduled to begin in the spring 2022 semester. The 82,000-square-foot space will focus on STEM education at Gonzaga and place a special emphasis on cross-disciplinary collaboration. The building will feature skybridges connecting it to the PACCAR Center for Applied Science and to the College of Arts and Sciences’ chemistry and biology departments in Hughes Hall.

According to a brochure on the university website, the new facility will increase the university’s STEM space by 44% and add 18 new labs, including a Psych Suite, a math lab, an innovation lab, a circuits lab, technology and engineering labs, student project wet & dry labs, a dynamics & vibration lab, an innovation studio, and more.

The project’s lead architect is SRG Partnership Inc. of Portland, Ore., partnering with Integrus Architecture of Spokane, Wash.; Research Facilities Design of San Diego, Calif.; MW Engineers of Spokane; and DCI Engineers of Spokane.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

Digital Edition