Restroom Partition Redesign Increases Privacy

Commercial washrooms solutions company Bradley Corp. recently announced the redesign of its Mills Phenolic No-Site Partitions to eliminate gaps between doors and pilasters, offering increased privacy in all types of educational facilities. The design is now standard for the company’s full portfolio of Phenolic models in an attempt to increase the safety and comfort of the restroom experience.

The manufacturer has added a vertical phenolic partition line with a rabbeted edge along both the hinge and latch sides of the door, closing off sight lines between the interior and exterior of the restroom stall. The product is available in 12 colors and four different mounting styles. The phenolic core material has been GREENGUARD certified as low-emitting, and it stands up against high use, moisture, oil, bacteria, and graffiti. Select models are also available with extra-large panels.

“Bradley’s research shows that almost half of Americans are uncomfortable or bothered by the small gap between doors and pilasters in restroom partitions,” said Mary Scherer, product manager for Bradley Corp. “Our new Phenolic No-Site redesign eliminates unsightly gaps and gives owners and architects the options to create comfortable and discreet spaces for restroom users. We’re excited to deliver full privacy partition solutions for our customers as standard.”

The partitions come with pre-drilled indicator latch holes, as well as pre-installed threaded inserts on pilasters and doors, for easy installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.