Restroom Partition Redesign Increases Privacy

Commercial washrooms solutions company Bradley Corp. recently announced the redesign of its Mills Phenolic No-Site Partitions to eliminate gaps between doors and pilasters, offering increased privacy in all types of educational facilities. The design is now standard for the company’s full portfolio of Phenolic models in an attempt to increase the safety and comfort of the restroom experience.

The manufacturer has added a vertical phenolic partition line with a rabbeted edge along both the hinge and latch sides of the door, closing off sight lines between the interior and exterior of the restroom stall. The product is available in 12 colors and four different mounting styles. The phenolic core material has been GREENGUARD certified as low-emitting, and it stands up against high use, moisture, oil, bacteria, and graffiti. Select models are also available with extra-large panels.

“Bradley’s research shows that almost half of Americans are uncomfortable or bothered by the small gap between doors and pilasters in restroom partitions,” said Mary Scherer, product manager for Bradley Corp. “Our new Phenolic No-Site redesign eliminates unsightly gaps and gives owners and architects the options to create comfortable and discreet spaces for restroom users. We’re excited to deliver full privacy partition solutions for our customers as standard.”

The partitions come with pre-drilled indicator latch holes, as well as pre-installed threaded inserts on pilasters and doors, for easy installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Colorado State University Global, SCTE Launch Online Certificate Program

    Colorado State University Global (CSU Global), based in Denver, Colo., recently announced a partnership with CableLabs subsidiary the Society of Cable Telecommunications Engineers (SCTE) to launch an online certificate training program for broadband professionals, according to a news release.

Digital Edition