Wesleyan Breaks Ground on New Art Gallery

On the campus of Wesleyan University in Middletown, Conn., officials broke ground this week on a new art gallery. The Davison Art Gallery will be the campus’ first new art building since the mid-1970s. The university is partnering with design firm Peterson Rich Office (PRO) and Newman Architects on the project, which is projected for completion in summer 2023 and to open its doors to students for the spring 2024 semester.

The university found itself outgrowing its existing art gallery, the Davison Art Center, which houses a collection of more than 25,000 works of art. The collection was already relocated to the Olin Memorial Library in 2019. The new facility will measure in at 5,550 square feet and was designed as a long, narrow space to fit between the library and the Public Affairs Center.

“The new gallery presents an opportunity to expand the visual arts from the iconic Kevin Roche-designed Center for the Arts to the very heart of the campus,” said PRO founders Nathan Rich and Miriam Peterson. “The building is deliberately designed for interdisciplinary learning and to expose a range of students to this renowned collection.”

The facility will feature an open, glass-walled lobby space and an exterior of red brick and limestone to blend into the surrounding area. An outdoor teaching courtyard and exterior gathering space will serve as active learning environments for a variety of courses. Sustainability initiatives include a green roof, solar panels, in-flooring heating and cooling, motion-sensor lighting, displacement ventilation and a landscape of native plants. The gallery represents PRO’s first full, ground-up project in the education vertical.

The Davison Art Gallery is being constructed simultaneously with renovations to the adjacent Public Affairs Center (PAC). The gallery will be accessible through the PAC as well as via walkways in front of and behind the library.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.