Wesleyan Breaks Ground on New Art Gallery

On the campus of Wesleyan University in Middletown, Conn., officials broke ground this week on a new art gallery. The Davison Art Gallery will be the campus’ first new art building since the mid-1970s. The university is partnering with design firm Peterson Rich Office (PRO) and Newman Architects on the project, which is projected for completion in summer 2023 and to open its doors to students for the spring 2024 semester.

The university found itself outgrowing its existing art gallery, the Davison Art Center, which houses a collection of more than 25,000 works of art. The collection was already relocated to the Olin Memorial Library in 2019. The new facility will measure in at 5,550 square feet and was designed as a long, narrow space to fit between the library and the Public Affairs Center.

“The new gallery presents an opportunity to expand the visual arts from the iconic Kevin Roche-designed Center for the Arts to the very heart of the campus,” said PRO founders Nathan Rich and Miriam Peterson. “The building is deliberately designed for interdisciplinary learning and to expose a range of students to this renowned collection.”

The facility will feature an open, glass-walled lobby space and an exterior of red brick and limestone to blend into the surrounding area. An outdoor teaching courtyard and exterior gathering space will serve as active learning environments for a variety of courses. Sustainability initiatives include a green roof, solar panels, in-flooring heating and cooling, motion-sensor lighting, displacement ventilation and a landscape of native plants. The gallery represents PRO’s first full, ground-up project in the education vertical.

The Davison Art Gallery is being constructed simultaneously with renovations to the adjacent Public Affairs Center (PAC). The gallery will be accessible through the PAC as well as via walkways in front of and behind the library.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

Digital Edition