Wesleyan Breaks Ground on New Art Gallery

On the campus of Wesleyan University in Middletown, Conn., officials broke ground this week on a new art gallery. The Davison Art Gallery will be the campus’ first new art building since the mid-1970s. The university is partnering with design firm Peterson Rich Office (PRO) and Newman Architects on the project, which is projected for completion in summer 2023 and to open its doors to students for the spring 2024 semester.

The university found itself outgrowing its existing art gallery, the Davison Art Center, which houses a collection of more than 25,000 works of art. The collection was already relocated to the Olin Memorial Library in 2019. The new facility will measure in at 5,550 square feet and was designed as a long, narrow space to fit between the library and the Public Affairs Center.

“The new gallery presents an opportunity to expand the visual arts from the iconic Kevin Roche-designed Center for the Arts to the very heart of the campus,” said PRO founders Nathan Rich and Miriam Peterson. “The building is deliberately designed for interdisciplinary learning and to expose a range of students to this renowned collection.”

The facility will feature an open, glass-walled lobby space and an exterior of red brick and limestone to blend into the surrounding area. An outdoor teaching courtyard and exterior gathering space will serve as active learning environments for a variety of courses. Sustainability initiatives include a green roof, solar panels, in-flooring heating and cooling, motion-sensor lighting, displacement ventilation and a landscape of native plants. The gallery represents PRO’s first full, ground-up project in the education vertical.

The Davison Art Gallery is being constructed simultaneously with renovations to the adjacent Public Affairs Center (PAC). The gallery will be accessible through the PAC as well as via walkways in front of and behind the library.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.