Butler University to Start Construction on Esports Arena

On the campus of Butler University in Indianapolis, Ind., construction is set to begin shortly on a new facility for esports and technology. The 7,500-square-foot Butler Esports Park was originally announced in 2019 but placed on hold due to the pandemic. The multi-use space will be built into the university’s Sunset Avenue parking garage and is scheduled to open its doors by the beginning of the fall 2022 semester.

The space will feature high-performance gaming PCs and consoles, coworking and event spaces, office areas, a studio and production room, and a café, among other amenities, and it will serve not only the university’s tech community but also that of Indianapolis at large.

“We strive to be a leader in building a culture of innovation, equity and operational excellence that supports our students and their learning—both inside and outside of the classroom,” said Dr. Frank Ross, Butler’s Vice President for Student Affairs. “Even through a challenging year due to the pandemic, Butler engaged our students, faculty and staff through esports in meaningful ways—adding a new academic minor, and pivoting to adapt recruiting, planning and event executions, as well as creative opportunities for community engagement, to advance our holistic vision for esports.”

The university is partnering with sports facilities architect Populous for the design process. Populous has designed facilities like the Fusion Arena in Philadelphia, Pa.; a 100,000-square-foot esports stadium in Arlington, Texas; and several venues for the Olympics.

“It is truly a pleasure to be on the front lines of the esports facilities movement across North America,” said Brian Mirakian, Populous Esports Director for the Americas. “Esports and gaming are becoming widely accessible to audiences more than ever before. By bringing together gaming, innovation and a dynamic creator environment, we are setting the stage for a new paradigm for student life and collegiate esports. We’re tremendously excited to integrate this state-of-the-art project into the fabric of the Butler campus.”

Lee Farquhar, the Interim Director at the BU School of Journalism and Creative Media, commented that the facility will bring in more energy and build student excitement about participating in esports. He called the facility a great space to practice, compete and meet other industry professionals. He added that the space will have a gallery in the middle and include as much flexible space as possible.

“They will be able to hold competitions, and there is a production studio environment. A food and beverage component will be woven into the space,” said Mirakian. “When we designed the space, there’s a live audience that can gather, cheer for the home team. Not only are you watching the action onstage, but you are watching the action on a digital screen.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.