Fort Knox to Replace 63-Year-Old Elementary School

The Department of Defense Education Activity (DoDEA) has announced a new elementary school on the grounds of Fort Knox in Kentucky. It will replace the existing, 63-year-old facility for Van Voorhis Elementary School with what a news release calls a “state-of-the-art, 21st-century school.”

“All of our schools at Fort Knox are well known for providing a high-quality education for on-post children, and though it’s the oldest school on post, Van Voorhis Elementary is no different,” said Fort Knox Garrison Commander Col. Lance O’Bryan. “The staff at that school have done a truly wonderful job teaching our children with the tools at their disposal, so with a brand-new facility and the latest technology, the sky’s the limit.”

Van Voorhis is one of four DoDEA schools at Fort Knox, alongside Kingsolver Elementary School, Scott Intermediate School and Fort Knox Middle High School. Construction work on the new facility will be done by the U.S. Army Corps of Engineers’ Louisville District. Work is scheduled to begin during the current academic year and be finished in time for the 2024­–25 school year. The facility will measure in at 104,000 square feet and cost about $58.9 million.

“You could hear exclamations of joy across the school when we learned the new school is on its way,” said Van Voorhis Elementary School Principal Angelique Johnson. “Everyone is looking forward to stepping into a new Van Voorhis Elementary School. Teachers love the idea of collaborative spaces, and the students love the idea of being connected to the outdoors. We cannot wait.”

According to a news release, all DoDEA schools take a “student-centered, participatory and experientially oriented” approach to school design. The facilities are designed within an open neighborhood concept that allows all students in a given neighborhood to work and collaborate during the day. Each grade level has its own multipurpose space surrounded by various-sized instructional spaces for breakout group work or one-to-one instruction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition