Greenheck Announces Redesign for Energy Core Ventilator Line

Air movement, control and conditioning solutions company Greenheck announced this week that it has redesigned its Energy Core Ventilator (ECV) line. According to a news release, the upgrade is meant to ensure the best possible unit performance within the smallest available footprint for space-sensitive installations either indoors or outdoors.

The press release states that the new ECV units feature direct drive plenum fans with variable frequency drives (VFDs). The new fans replace the more standard forward-curved fans to reduce motor horsepower requirements and the associated electrical wire and circuit breaker sizes. The VFD facilitates balancing during start-up, and the removal of belts simplifies maintenance procedures. It also features reduce sound power levels as backed by radiated sound data tested in accordance with AMCA 320-07.

Greenheck Energy Core Ventilator ECV 30
Photo courtesy of Greenheck

The ECV line has an airflow capacity of up to 5,000 cfm and comes with an AHRI Certified fiber membrane core or washable polymer core. Other model ECV features include double-wall construction with optional lift-off or hinged access for flexibility during new or retrofit installations. The standalone microprocessor controls allow for the management of downstream electric heaters and heating or cooling coils. Other options include frost, fan speed and economizer controls.

The energy core ventilators were designed for environments like schools, residence halls, hospitals, nursing homes and offices, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition