N.J. Opens Rebuilt Camden High School

African-American-owned design firm DIGroup recently joined school officials, faculty and students for the ribbon-cutting ceremony of one of the largest projects in the firm’s history. The new, $133-million Camden High School in Camden, N.J., represents the design firm’s continued commitment to providing urban school replacement projects across the state of New Jersey.

The two-story, 270,000-square-foot facility was designed to hold a capacity of 1,200 students in grades 9–12. According to a press release, the facility features four separate schools: Camden High, Big Picture Learning Academy, Brimm Medical Arts Academy and the Creative Arts Academy. The original Camden High school was built in 1916 and demolished in 2017. The school’s historic presence in the community inspired designers to feature many facets of the original design in the new construction—most notably, the arch from the former school’s main entrance, the original 1916 cornerstone and a time capsule.

Camden High School
Camden High School ribbon-cutting ceremony

The new facility is the first new public high school in Camden in over a century. As such, it features a wide array of new amenities like open spaces and plenty of natural light; state-of-the-art classrooms; an auditorium, black box theater and dance studio; STEM classrooms and science labs; art studios; entrepreneurial and maker spaces; a broadcast studio; computer and robotics labs; and an updated weight room and locker rooms.

“We are thrilled to have once again completed an important project for the urban public-school students of New Jersey here in Camden,” said Jeffrey D. Venezia, AIA, Principal with DIGroup Architecture. “Creating a safe, secure and sustainable facility connected to its rich and diverse history has been both an honor and a privilege for all of us at DIG.” Venezia went on to discuss how the community and students themselves contributed to the design process.

"The kids deserved a better learning environment,” said former Camden mayor Dana Redd. “So we saw the need to secure funding to build a new high school, so our students can learn in a 21st-century environment, and be prepared for 21st-century jobs. We also want our teachers to be able to do their jobs, to have the technology and the resources they need to prepare students."

DIGroup has since been awarded its fifth new school project by the New York City Schools Construction Authority.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

  • Key Considerations for Office-to-Higher-Education Facility Conversions

    Since the onset of the COVID-19 pandemic, office-to-alternative-use conversions have become a recurring subject of urban development discourse. Office utilization rates across major U.S. cities remain below 50%, with vacancy rates exceeding 27% in San Francisco and 16% in New York. Higher education facilities present programmatic and spatial use cases that align readily with the typical characteristics of commercial office buildings.

  • Singlewire Software Report Reveals Gaps in K–12 School Entrance Security

    Single Software recently released its first-ever School Entrance Security Report based on more than 500 responses from U.S. school staff members. According to a news release, the findings highlight a gap between K–12 leaders’ wishes for school safety and how safe the schools actually are, as well as the challenges facing students and staff in that goal.

Digital Edition