Arizona Charter School Debuts Expansion, Renovations

Construction management firm Adolfson & Peterson (AP) and charter school network Candeo Schools announced recently that they have completed an extensive expansion and renovation project on Candeo North Scottsdale in Scottsdale, Ariz. Work included the new construction of two buildings, cosmetic and structural renovations to existing facilities and updates to outdoor areas, and according to a press release, the project was finished three months ahead of schedule.

“AP has built schools in the Phoenix area for more than thirty years. When the pandemic hit, we collaborated closely with Candeo Schools, SPS+ Architects and local subcontractors to problem-solve many of the issues that other projects were experiencing,” said Scott Salyer, AP’s Vice President of Operations. “By working together, not only did we stick to the schedule, but we delivered the school three months early. We’re pleased with the outcome and confident the school’s additions and renovations leave it fully equipped to effectively educate and accommodate students in one of the fastest-growing suburbs of Phoenix.”

The project was completed in two phases. The first phase involved remodeling the existing administration building, renovating the courtyard, landscaping the playfield, painting and sealing concrete floors and expanding the playground. The second phase involved constructing two new buildings. The first measures in at 7,902 square feet and includes six new classrooms. The second, which covers 2,470 square feet, adds here more classrooms as well as a fire riser room, a mechanical room and an electrical closet.

“Our work with Adolfson & Peterson has been a smooth and impressive experience,” said Dr. Stephanie Musser, CEO and founder of Candeo Schools. “The care and responsiveness they have shown in meeting our school’s goals has been readily apparent from the start. The result is a customized, beautiful campus tailored to the needs of our community and our education program.”

The North Scottsdale Campus of Candeo Schools opened in August 2020. It serves students in grades K–8 and aims to provide a knowledge-based, classical liberal arts education.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Rochester to Break Ground on New Student Life Center

    The University of Rochester in Rochester, N.Y., recently began construction on a new Student Life building, according to a news release. The first floor will contain campus-wide gathering, program, and rehearsal space; the second floor will play home to the Greenbaum Center for Jewish Life.

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.

  • Growing Allied Health Workforce Demands Fueling Greater Need for Higher Education Facilities

    With the demand for healthcare professionals at an all-time high, colleges and universities are challenged with supporting the workforce demands in their own communities. Careers in allied health generally require specific training and/or certification, with some positions requiring degrees, certified credentials, and continuing education.