Mohawk Joins Climate Pledge

Commercial flooring manufacturer Mohawk Group has joined the Climate Pledge, an effort launched by Amazon and Global Optimism with the aim of accelerating climate action above and beyond the goals set out in the Paris Agreement.

The Climate Pledge, launched in 2019, aims for carbon neutrality by 2040, 10 years ahead of the Paris Agreement. It includes three commitments: regular reporting, carbon elimination and meaningful, credible carbon offsets. Signatories to the pledge as of this writing number more than 200 and represent more than $1.8 trillion in annual revenues — a little more than 2.1% of the gross world product (as of 2020) and are "expected to collectively mitigate 1.98 billion metric tons (BMT) of carbon emissions from a 2020 baseline. This is equivalent to 5.4% of current global annual emissions." In September alone, 83 companies joined the pledge, including Procter & Gamble, HP and Salesforce.

According to Mohawk: "Mohawk Group has already begun implementing major manufacturing changes to eliminate its carbon footprint, striving toward a holistic improvement of its flooring's lifecycle to reduce the amounts of water, energy, carbon and waste involved in the process. As of 2022, all Mohawk Group flooring products will be carbon neutral plus an additional 5% carbon offset; the group’s carpet tile already meets this goal. With this new initiative, all Mohawk Group hard surface and soft surface floors will have a net positive impact on climate."

Further details about the Climate Pledge can be found at theclimatepledge.com.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.