Mohawk Joins Climate Pledge

Commercial flooring manufacturer Mohawk Group has joined the Climate Pledge, an effort launched by Amazon and Global Optimism with the aim of accelerating climate action above and beyond the goals set out in the Paris Agreement.

The Climate Pledge, launched in 2019, aims for carbon neutrality by 2040, 10 years ahead of the Paris Agreement. It includes three commitments: regular reporting, carbon elimination and meaningful, credible carbon offsets. Signatories to the pledge as of this writing number more than 200 and represent more than $1.8 trillion in annual revenues — a little more than 2.1% of the gross world product (as of 2020) and are "expected to collectively mitigate 1.98 billion metric tons (BMT) of carbon emissions from a 2020 baseline. This is equivalent to 5.4% of current global annual emissions." In September alone, 83 companies joined the pledge, including Procter & Gamble, HP and Salesforce.

According to Mohawk: "Mohawk Group has already begun implementing major manufacturing changes to eliminate its carbon footprint, striving toward a holistic improvement of its flooring's lifecycle to reduce the amounts of water, energy, carbon and waste involved in the process. As of 2022, all Mohawk Group flooring products will be carbon neutral plus an additional 5% carbon offset; the group’s carpet tile already meets this goal. With this new initiative, all Mohawk Group hard surface and soft surface floors will have a net positive impact on climate."

Further details about the Climate Pledge can be found at theclimatepledge.com.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.