Armstrong Introduces Direct-Attach Ceiling, Wall Panels

Armstrong Ceiling & Wall Solutions recently introduced its Tectum Create! Direct-Attach line of ceiling and wall panels. The textured panels come in a variety of standard and custom designs to add flair and aesthetics to any space. The 1”-thick panels also provide acoustic benefits, featuring a Noise Reduction Coefficient (NRC) of up to 0.85 depending on the method of installation. According to a news release, the panels could serve as a retrofit solution for noise reduction.

Armstrong Tectum Create Direct Attach Panels
Photo Courtesy of Armstrong World Industries

The panels come in four standard designs: Textured Hex, Exposed Brick, Rustic Plank and Steady Wave. Armstrong can also create custom designs to match any client’s aesthetic. The repeated panel patterns allow the panels to span as far as necessary both horizontally and vertically along a surface.

The panels are available in two sizes: 23 ¾" x 48" and 47 ¾" x 96" with long and short beveled edges. As the name suggests, they can attach directly to a variety of interior wall and ceiling surfaces. The panels are made from cementitious wood fiber and are part of the organization’s Sustain portfolio. They’re also part of the CleanAssure portfolio of easily disinfectable, cleanable products to help make spaces safe and clean.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.