Marquette $60M Business School on Track to Open Dec. 2022

Milwaukee's Marquette University is on track to complete construction of a new, $60-million business school in a year. According to the institution, the facility is the largest donor-funded one in its history.

The 100,000-square-foot structure is designed to include collaborative classroom, lab and study spaces; an event space; faculty offices; and areas for programmatic centers of excellence. The first floor will provide wrap-around student support with advising, a student success center and a business career center.

The new space will also include a café, where "collisions between our students, our faculty and our stakeholders will happen," according to Tim Hanley, interim dean of the College of Business Administration.

Marquette University Business School

As people walk into the building, they'll enter a "light-filled atrium" that leads to a planned Applied Investment Management Lab, "where we think the action's going to happen," said Hanley. "I think this facility will be a gamechanger for the university across all of our landscape."

The new facility will also house innovation leadership programs, including Excellence in Leadership (E-LEAD) and interdisciplinary Bridge to Business for Engineers. Campus officials noted that Its closeness to the university's College of Engineering "will help foster creative collisions of thought and perspective that fuel an innovative mindset."

The four-story building design is being led by Vice President for Planning and Facilities Management, Lora Strigens, and her team, in partnership with architectural firms BNIM of Kansas City and Milwaukee-based Workshop Architects. Findorff is constructing the building

The building is scheduled to open in December 2022.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.