Texas Debuts New Elementary School

The Lamar Consolidated Independent School District (Lamar CISD) in Fort Bend County, Texas, about 40 miles west of Houston, celebrated the start of 2022 with the opening of a new elementary school. Fletcher Morgan Jr. Elementary School finished construction in December 2021 and now plays home to about 750 students in grades PreK–5.

According to a news release, Morgan Elementary is the district’s 29th elementary school and the fourth to be designed by VLK Architects. VLK held meetings with school leaders to design a space that would increase engagement among the curriculum, students, teachers and parents.

“VLK Architects has done a phenomenal job designing our new campus, Morgan Elementary,” said Dr. Roosevelt Nivens, Lamar CISD Superintendent. “It truly is a beautiful campus equipped with everything that our scholars need to have an exciting and impactful learning environment. We are grateful for this new addition to our Lamar CISD community.”

The new facility was proposed as part of the 2017 bond election. It features learning areas organized into pods containing 6–8 classrooms, restrooms, storage space, collaboration space and outdoor areas. The design also includes modular furniture, media stations and activity walls to ensure a dynamic, active learning environment. Collaborative spaces like music and art rooms are located next to the gym and cafeteria to reduce ambient noise throughout the building. The full facility covers about 48,400 square feet.

“It’s an honor to be able to work with Lamar CISD in opening another elementary school that serves the students, faculty, and staff in this fast-growing community,” said Todd J. Lien, AIA, Managing Partner of VLK Architects.

The total cost of the project came in at $24 million, funded as part of the bond. The district partnered with VLK Architects for design and Drymalla Construction as the general contractor.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.