Williams College Plans Expansion of Campus Diversity Center

Williams College in Williamstown, Mass., will start construction this summer on a $27.5-million expansion to its campus diversity center. The project will take the Davis Center—which promotes institutional diversity, equity and inclusion—from 18,650 square feet to 26,350 square feet by an estimated completion date of fall 2023.

“The Davis Center, through the Pathways for Inclusive Excellence Office, offers a constellation of programs and initiatives that make sure all students thrive academically at Williams and beyond, and work to eradicate racial and socioeconomic disparities in higher education,” said D. Clinton Williams, director of Pathways for Inclusive Excellence at Williams. These programs include research opportunities; co-curricular engagements and workshops; and other opportunities for mentorship, academic enrichment, community-building and activism.

Local news reports that new spaces in the center will include offices, meeting and study rooms, student lounges, a laptop study bar, a spiritual and religious reference room, kitchens and dining rooms and multi-purpose spaces. It will also feature a large event space.

The college plans to demolish two existing buildings, Hardy House and Chandler Hall, to make room for the new construction. The school is partnering with design firm Leers Weinzapfel Associates in collaboration with J. Garland Enterprises.

“The Davis Center building project will advance academic, social and cultural engagement for all—especially those from groups historically underrepresented [in higher education]”, said Leticia Smith-Evans Haynes, Williams College vice president for Institutional Diversity, Equity and Inclusion. “The investment in the physical space also highlights the college’s continued commitment to diversity, equity and inclusion.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.