California District Completes District Office, Adult School Building

The Fremont Union High School District (FUHSD) in Sunnyvale, Calif., recently saw the completion of a new District Office and Adult School Building for the district. The space measures in at 27,000 square feet and features education, administrative and support spaces. It was built to replace a previous facility that needed “extensive structural repairs,” according to a news release. The district partnered with Quattrocchi Kwok Architects and Blach Construction on the project.

“The completion of our new District Office and Adult School represents an exciting new phase of enhanced offerings and increased connection to our schools. Not only does this multi-purpose building double as a modern home for district operations and comprehensive Adult School, it serves as a central hub that facilitates access between our schools, community members and district administration,” said Polly Bove, FUHSD superintendent.

Fremont Union High School District District Office and Adult School Building

The new facility offers classroom facilities for Adult School courses including English as a Second Language (ESL), GED preparation and citizenship preparation. It also includes District Office amenities like offices, professional and continuing education rooms and a board room for district meetings.

“It is so rewarding to partner with a client that shares a commitment to enhancing their community,” said Blach President Dan Rogers. “Over the years, we’ve had the great fortune to be involved in several very impactful district-wide projects that support FUHSD’s dedication to providing comprehensive and equitable educational opportunities. Now, we’re incredibly honored to deliver their new District Office and Adult School, a long-awaited building that celebrates their history and inspires continued success.”

A press release notes that the project was funded partly by community-supported Bond Measure CC. From a sustainability perspective, it meets or exceeds the requirements set by California Green Building and Energy Codes, featuring energy-efficient mechanical equipment, stormwater filtration, low-VOC materials and sustainable landscaping.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.