College of Charleston Begins Renovation Projects

The College of Charleston in Charleston, S.C., recently kicked off two campus renovation projects.

Craig Hall, which contains the Admissions Visitor Center and Office of Admissions, will receive a series of mechanical renovations, according to university news. Admissions services will move to another campus building for the duration, and Craig Hall is scheduled to reopen before the beginning of the 2022–23 academic year.

Renovations to the first floor of the Marlene and Nathan Addlestone Library are also underway. Additions are slated to include more collaborative space for students, an expanded access and instruction desk in support of student and faculty research, two podcast studios and a permanent exhibition featuring items from the John M. Rivers Communications Museum.

University news reports that the library will remain open during all phases of renovation and that the major phases of construction work are scheduled during the college’s summer and winter breaks.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.