Sharp NEC Display Solutions Debuts New LCD Laser Projectors

Sharp NEC Display Solutions, which provides projectors and displays to a worldwide market, recently announced the addition of two new LCD laser projectors to its PE Series. The PE506UL and PE506WL were designed for use in K–12, higher education and corporate spaces and provide high-resolution images at a brightness of 5,200 lumens, according to a news release.

Sharp NEC Display Solutions PE506UL
The Sharp NEC Display Solutions PE506UL

“To meet the ever-changing needs of our customers, we’ve upgraded our PE Series entry-installation laser projector lineup with brighter, more flexible solutions for projector replacements or new installations. The upgraded PE Series projectors are among the smallest and lightest 5,000-lumen projectors in the market and include advanced features ideal for socially distanced classrooms, large lecture halls or even corporate environments,” said Ryan Pitterle, Product Manager, Sharp NEC Display Solutions. “The PE506UL and PE506WL are perfect for the cost-conscious customer looking to make the lamp-to-laser transition.”

The news release states that the PE506UL offers WUXGA 1920x1200 resolution and the PE506WL offers WXGA 1280x800 resolution. The light source offers a minimum of 20,000 hours of life to reduce both maintenance requirements and total cost of ownership. The LCD technology offers clear and dynamic images, bright colors, and both manual horizontal and vertical lens shift for ease of installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.