Sharp NEC Display Solutions Debuts New LCD Laser Projectors

Sharp NEC Display Solutions, which provides projectors and displays to a worldwide market, recently announced the addition of two new LCD laser projectors to its PE Series. The PE506UL and PE506WL were designed for use in K–12, higher education and corporate spaces and provide high-resolution images at a brightness of 5,200 lumens, according to a news release.

Sharp NEC Display Solutions PE506UL
The Sharp NEC Display Solutions PE506UL

“To meet the ever-changing needs of our customers, we’ve upgraded our PE Series entry-installation laser projector lineup with brighter, more flexible solutions for projector replacements or new installations. The upgraded PE Series projectors are among the smallest and lightest 5,000-lumen projectors in the market and include advanced features ideal for socially distanced classrooms, large lecture halls or even corporate environments,” said Ryan Pitterle, Product Manager, Sharp NEC Display Solutions. “The PE506UL and PE506WL are perfect for the cost-conscious customer looking to make the lamp-to-laser transition.”

The news release states that the PE506UL offers WUXGA 1920x1200 resolution and the PE506WL offers WXGA 1280x800 resolution. The light source offers a minimum of 20,000 hours of life to reduce both maintenance requirements and total cost of ownership. The LCD technology offers clear and dynamic images, bright colors, and both manual horizontal and vertical lens shift for ease of installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.