LSU Vet School Debuts Pet Clinic with “Ribbon-Biting” Ceremony

Officials from the Louisiana State University School of Veterinary Medicine in Baton Rouge, La., gathered on Monday, May 9, to celebrate the opening of the new Stephenson Pet Clinic. The facility measures in at 40,000 square feet and will serve as a home to companion animal wellness efforts as well as clinical services like community practice / primary care, integrative medicine, dermatology and ophthalmology, according to a press release.

Guests included Oliver Garden, LSU Vet Med dean; LSU President William Tate; and Louisiana Governor John Bel Edwards. And the honors of the actual ribbon-cutting were given to Mac, a Belgian Malinois owned by a staff veterinary technician, who retrieved a toy attached to the ribbon.

The building was named after Emmet and Toni Stephenson, who pledged $25 million to LSU in 2007. The new pet clinic was constructed through a combination of state funds and $4 million from more than 300 individual donors, including the Stephensons. The existing Veterinary Medicine Building was built in 1978, and the new space will accommodate the school’s growth in enrollment, labs and reach of services since then.

“The generosity of Emmet and Toni Stephenson, and all the other donors who made this dream possible, will be memorialized in the rich legacy this wonderful facility will leave for generations to come," said Dean Garden. "The School of Veterinary Medicine is on a firm trajectory of growth in its missions of teaching, healing, discovering, and protecting – nobly serving Louisiana, the nation, and indeed the world. It is the honor of a lifetime to be at the helm of this outstanding veterinary school at this exciting time in our history.”

The facility was designed by Tipton Associates and BDA Architecture and also includes a 6,000-square-foot green roof terrace. The Stephenson Pet Clinic will open to the public in July.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.