Saddleback College Opens New STEM Facility

Saddleback College in Mission Viejo, Calif., recently opened a new STEM facility on its campus. The Advanced Technology and Applied Sciences (ATAS) building measures in at 52,913 square feet and provides multidisciplinary space for labs and classrooms, general instructional areas, and administrative space. The building will serve career technical education students in subjects like architecture and drafting, environmental sciences, communications, horticulture and more.

The college partnered on the project with construction firm McCarthy Building Companies, Inc. and architecture and design firm HED.

“We’re ecstatic to open this new facility for our students, faculty, staff and broader Orange County community,” said Ann-Marie Gabel, Vice Chancellor, Business Services, for the South Orange County Community College District. “It’s a beautiful space, designed to promote student-to-student collaboration and a sense of openness as the facility blends into the gorgeous Southern California landscape. Students can enjoy the local habitat and feel more connected to nature with onsite butterfly gardens, bird and wildlife areas.”

A news release notes that the ATAS building has achieved a LEED Gold rating equivalency with passive design strategies intended to minimize energy use. The main part of the building connects directly with campus sidewalks. Students enter through one of two entrances into a central collaboration space that opens into a courtyard. Two wings containing classrooms and lab space flank the courtyard, while landscape areas serve as outdoor learning gardens.

“The ATAS project enabled us to integrate the campus, with its highly beautiful natural surroundings, while exceeding the SOCCCD’s goals for the space,” said Martha Ball, Principal at HED. “The design considerations employed were a celebration of the natural habitat, which surrounds the Saddleback College campus. With energy efficiency in mind, the ATAS facility effectively harvests daylight to reduce the need for electrical lighting and derives 35 percent of its energy from solar panels. This, combined with an efficient wall-to-window ratio, are the main strategies to achieve energy savings. Additionally, the concrete structure provides thermal mass to absorb heat with nightly release, and longevity through a robust structure.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition