Orange County District to Open 5 New Schools

Orange County Public Schools in Orange County, Fla., will open five new schools in August to accommodate rising enrollment figures, according to a news release.

The district plans to open three new elementary schools (Hamlin Elementary, Panther Lake Elementary and Stonewyck Elementary), one middle school (Hamlin Middle School) and one K–8 school (Kelly Park School). The five schools have combined total capacity of 5,000 students and bring the district’s total number of schools to 210, the ninth-largest in the U.S. The K–8 facility, Kelly Park, will absorb future growth in the area, the news release reports.

The construction project cost an estimated $156.2 million and created 1,155 jobs in the area. All schools were built according to Green Globes environmental construction standards, reports the news release.

The district will host a series of open houses before the schools open for the semester.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.