University of Virginia Partners with BenchPro on Studio Space

The University of Virginia School of Architecture (UVA) is providing students with a new and improved design education environment which includes a 24,000 square foot renovation project as well as model making spaces.

Campbell Hall offers two full floors of studio space and fabrication spaces. Model making facilities are available throughout the building as well as renovated classrooms. This inspiring environment is where future architects and designers experiment and create with the use of specialized equipment.

Anselmo Canfora, Associate Professor and Associate Dean of Academics at UVA, enlisted BenchPro’s help with the manufacturing of workstations. The company, Canfora and Iñaki Alday (Chair of the Architecture Department at the time) worked together to design and equip a series of highly purposeful studio spaces that would support architectural design education.

“Campbell Hall is a significant example of modern architecture on this historic campus. Built in 1970, it has served the School of Architecture very well,” explains Canfora. “Following an aggressive schedule, the redesign of the design studios and supporting spaces focused on improving the working environments of the A-School to promote well-being, creativity, and collaboration.”

The UVA project was completed the winter of 2019 through a university-wide effort that involved a variety of groups. It now provides a series of exceptional learning environments for students, staff, and faculty of the School of Architecture to work together.  The state-of-the-art facilities support 21st century architectural education and research, supporting students while they flourish through thoughtful experimentation.

“It was an honor to manufacture the 450 lab benches for the University of Virginia School of Architecture, in collaboration with Anselmo Canfora and the university,” says Xano Wang, co-owner of BenchPro. “We are proud to help bring new life to this space – we know how the look and function of a lab can power the creative process.”

Featured

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.