Alabama Elementary School Breaks Ground on Replacement Facility

Hartselle City Schools in Hartselle, Ala., recently broke ground on a replacement facility for the oldest school in its district. The new Crestline Elementary School will cover about 105,000 square feet, cost about $36 million, and is scheduled for completion in time for the beginning of the 2024–25 school year, according to local news.

The new building will have a capacity of more than 1,000 students in grades PreK–4. The primary purpose of construction was to relieve overcrowding at the existing school; local news reports that the district has grown by more than 500 students over the last ten years. School district leaders said they expect the trend to continue as new neighborhoods with hundreds of homes continue their development.

Amenities in the new elementary school will include 65 classrooms, a separate drop-off line for PreK and special needs students, a special-needs wing featuring a sensory room, gifted education classrooms, and an expanded robotics lab.

Part of the existing Crestline Elementary building will be demolished, and part of it will remain standing as additional classroom space for the district as needed, local news reports.

“Crestline has served our school system, our students, and our community well since its original construction in the 1950s,” said school board member Daxton Maze. “As education needs change and as Hartselle continues to grow, the expanded footprint of the new school will allow us to serve our rising student population in an environment that is conducive to high-quality instruction. The scholastic expectation in Hartselle is excellence, and the new Crestline School will be a visual representation of the community’s desire to provide the best education possible for our kids.”

The school district is partnering with Davis Architects for the building’s design and with Bailey-Harris Construction Co. for the building’s construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

Digital Edition