EMU Selects Builders for 'Welcome Home 2025' Initiative

Eastern Michigan University in Ypsilanti, Mich., recently announced that it will partner with Gilbane Building Company, Gilbane Development, Clark Construction, and AVB Inc. for the three-year, $200-million campus renovation project, according to a news release. The “Welcome Home 2025” initiative consists of the new construction of two new residence halls, as well as renovations to all other campus dorms to improve amenities like HVAC, restrooms, and technology upgrades.

One of the new residence halls, Lakeview Apartments, will be located next to the University’s Student Center, the press release reports. The other, Westview Apartments, will be on the campus’ west side near the university athletic facilities.

“Students are very excited to see this investment in student life and our on-campus experience, and we are proud of the role EMU students played in getting this project off the ground,” said EMU student body president Auryon Azar. “Walking by the construction site is a reminder of what is possible when we advocate for ourselves and work with leaders in our community: we drive progress for everyone.”

Mackey Mitchell Architects and Progressive AE partnered with the university as the architects of record. During the planning and design process, they engaged extensively with university students, faculty, staff, stakeholders, and campus organizations over a four-month period to get input across the vast, diverse population and their needs.

“We at Gilbane Building Company, along with our development team partners, are excited to bring the Welcome Home 2025 vision to life at Eastern Michigan University,” said Lynn Rogien, Gilbane’s area manager. “This very important work will transform student housing for EMU students and will provide multiple opportunities for local trade contractors, including Disadvantaged Business Enterprises (DBE) partners. We look forward to delivering high quality, affordable facilities that will enhance the residential experience of EMU’s students and support the greater mission of Eastern MichiganUniversity as an institution of opportunity for all.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.