Malish Corp. Announces Resolution of Legal Proceedings

The Malish Corporation recently announced legal proceedings between itself and a former partner, Diamabrush LLC, have been resolved. According to a news release, the proceedings were filed in the federal court of Cleveland, Ohio, and involved patent infringement and unfair competition claims.

Malish, a leading provider of cleaning brushes and floor-care accessories, recently introduced the Diamond Devil Concrete & Terrazzo Restoration and Polishing System, which removes coatings from concrete floors, as well as prepares and polishes them to a fresh finish. The product is chemical-free and works with most standard floor machines, the news release reports.

The product’s 3+1 polishing process uses three tools, each featuring designed and angled blades, for use on concrete and terrazzo floors. The “+1” is an optional shine tool to provide gloss and clarity. Maintenance staff in a variety of industries can grind, hone, polish, and shine using the single product.

Similarly, the Mastic Demon can remove mastic, glue, paint, adhesive, thin-set, epoxy, and more from concrete floors.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.