Kraus-Anderson Finishes $21.4M, Two-School Renovation Project

Kraus-Anderson in Duluth, Minn., recently announced that it has completed a $21.43-million addition and remodel of two facilities for Ely Public Schools in Ely, Minn. The district consists of Ely Memorial High School and Washington Elementary School, which serve a combined total of about 550 students, according to a news release. The project involved 110,500 square feet of renovation work total, including a 71,000-square-foot remodel of the two schools, according to a news release.

“The project added a new 39,000-square-foot commons area that creates a connection link between the high school and the elementary school,” said Todd Erickson, senior project manager at Kraus-Anderson. “The area also contains a safe and secure entry system, school district offices, and high-school and elementary offices.”

Ely Public Schools Renovation Addition
Image courtesy of Shore to Shore Communications, Inc.

The new space includes CTE classrooms, a media center, gymnasium, music room, metals shop and wood shop, and a new cafeteria with upgraded kitchen equipment, the news release reports. The high school gained new boys’ and girls’ locker rooms, the elementary school a new Early Family Childhood Education (ECFE) area, and both received new HVAC systems.

Construction started in May 2021, and the school district also partnered with Architectural Resources, Inc., for the design.

“In addition to budget, staffing, and supply-chain challenges brought about by COVID-19, crews discovered 1,700 cubic yards of ledge rock, which had to be blasted and excavated to allow installation of new utilities,” Erickson said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition