Amherst College to Construct Lyceum

Bruner/Cott Architects recently announced that their latest project at Amherst College in Amherst, Mass., is currently under construction. The Aliki Perroti & Seth Frank Lyceum measures in at 20,000 square feet and has an estimated completion date of fall 2023, according to a project narrative.

The Lyceum will unite the college’s Center for Humanistic Inquiry (CHI), the history department, and other faculty members in spaces designed to foster collaboration and interaction among the university’s population at large. Features of the project include a historic house renovated to include offices, support spaces and classrooms; a two-story addition featuring an event space and flexible classrooms; a three-story office wing; an event space on the ground floor; and an outdoor terrace providing a central common area.

Amherst College Lyceum Rendering
Image courtesy of Bruner/Cott Architects

The Lyceum is designed with sustainability in mind to line up with Amherst’s commitment to carbon neutrality by 2030. The low-carbon construction will make use of materials like wood and plant-based materials. The building will be airtight and feature efficient HVAC systems as well as daylighting and scenic views of the campus, the project narrative reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition