Northwestern State University Breaks Ground on New Academic Building

Northwestern State University in Natchitoches, La., recently celebrated a groundbreaking ceremony for a new academic building named after a former university president. Alost Hall will measure in at 73,200 square feet and feature multipurpose classrooms for a wide variety of academic disciplines, according to a university news release. The total cost of the project is $44 million.

“It is incredibly significant for everybody, and for students that are not even on campus yet, students who are not even born yet. They are going to benefit from this investment, so in a very real way, this groundbreaking is a testament to the work that we have all done collectively to invest again in higher education,” said Louisiana Gov. Jon Bel Edwards at the ceremony. “Education is the engine for economic growth and diversification. It is the key to opportunity and prosperity for everybody.”

Amenities in the new facility will include simulation laboratories for nursing and anesthesia programs; a clinic and training area for social work and psychology students; twelve 30-person classrooms; two 40-person classrooms; three 50-person classrooms; and space for 60 offices and an administrative office area, as well as a large conference room and reception area.

“Today, we gather to celebrate the start of a new chapter in the lift of our institution as we begin construction of the state-of-the-art building that will serve as the hub of innovation, collaboration, and learning for generations of students, faculty, and staff to come,” said NSU President Dr. Marcus Jones. “This groundbreaking is a testament to the unwavering commitment of excellence in education, research, and service to our community.”

Local news reports that the new facility will replace John S. Kyser Hall, the largest building on campus, which was built in 1968.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition