OSU to Start Construction on Central Market Place

Oklahoma State University in Stillwater, Okla., recently announced that construction will soon begin on a new campus dining facility. Citing outdated facilities and student feedback on social media, the university will replace the existing Kerr-Drummond dining complex with Central Marketplace, a 31,000-square-foot facility with four dining options and a capacity for about 300 guests, according to a news release. The project will cost about $22 million.

“We get a lot of feedback about dining on social media, and we really listen to what the students are saying and try to put a lot of thought into these concepts based on feedback that we’ve received,” said Student Union Marketing assistant director Debbie Shotwell.

Dining options available in Central Market Place will include:

  • Byte: A restaurant with a “ghost kitchen” concept that will serve a diverse, rotating menu. Guests will place their orders via kiosk or mobile app, and the meal will be prepped behind closed doors and delivered through a wall of lockers.
  • Caribou Coffee: The franchise will serve traditional and specialty coffee drinks, as well as bakery items.
  • 405 Deli: The sandwich shop will move from the existing Kerr-Drummond dining complex into the new dining facility to serve salads and gourmet sandwiches.
  • 1890 Market: The market will serve as a rebranding of the university’s on-campus convenience store in Kerr-Drummond. It will provide items like groceries, snacks, necessities, and grab-and-go items, according to the university news release.

Central Market Place has an estimated completion date of fall 2024. After construction is finished, the university plans to demolish Kerr-Drummond to make room for student parking.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition