College Station ISD Breaks Ground on New CTE Center

The College Station Independent School District in College Station, Texas, recently broke ground on a new Career and Technical Education (CTE) Center. The district partnered with VLK Architects on the facility, which will serve both of its high schools, according to a news release. Funding for the project comes from a 2021 bond, and the first phase of construction is scheduled for completion by summer 2024.

The CTE Center’s first phase involves the construction of a district Agricultural Barn featuring 60 pens for small animals and 20 pens for cattle. It also includes a multipurpose arena to host both agricultural shows and CTE field trips, as well as expositions for students of all ages across the district. The building will also leave room for flexibility and expansion as the district agriculture program grows, the news release reports.

“There are many students in our district who want to show livestock,” said CSISD Director of Communications Chuck Glenewinkel. “Some of them to not have the ability to do so because of lack of land to do so, or homeowner association regulations in their neighborhoods. This facility will make it possible for all CSISD students to have the opportunity to learn accountability, bookkeeping, and showmanship, and if they are successful, they are financially rewarded at the end. There is power in learning the value of hard work and the rewards that accompany it.”

The school district and VLK Architects also partnered with construction engineering firm Salas O’Brien to determine the barn’s optimal mechanical, electrical, and plumbing requirements. The facility will feature wash stations, grooming stations, and storage areas subdivided to each high school that will give students the responsibility of maintaining their own spaces.

“VLK is honored to have partnered with College Station ISD in the design of the Agricultural Barn, the first within the school district,” said VLK Principal Melissa Fleming. “We are excited by the opportunities this facility will provide for all CSISD students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

  • Key Considerations for Office-to-Higher-Education Facility Conversions

    Since the onset of the COVID-19 pandemic, office-to-alternative-use conversions have become a recurring subject of urban development discourse. Office utilization rates across major U.S. cities remain below 50%, with vacancy rates exceeding 27% in San Francisco and 16% in New York. Higher education facilities present programmatic and spatial use cases that align readily with the typical characteristics of commercial office buildings.

  • Singlewire Software Report Reveals Gaps in K–12 School Entrance Security

    Single Software recently released its first-ever School Entrance Security Report based on more than 500 responses from U.S. school staff members. According to a news release, the findings highlight a gap between K–12 leaders’ wishes for school safety and how safe the schools actually are, as well as the challenges facing students and staff in that goal.

Digital Edition