College Station ISD Breaks Ground on New CTE Center

The College Station Independent School District in College Station, Texas, recently broke ground on a new Career and Technical Education (CTE) Center. The district partnered with VLK Architects on the facility, which will serve both of its high schools, according to a news release. Funding for the project comes from a 2021 bond, and the first phase of construction is scheduled for completion by summer 2024.

The CTE Center’s first phase involves the construction of a district Agricultural Barn featuring 60 pens for small animals and 20 pens for cattle. It also includes a multipurpose arena to host both agricultural shows and CTE field trips, as well as expositions for students of all ages across the district. The building will also leave room for flexibility and expansion as the district agriculture program grows, the news release reports.

“There are many students in our district who want to show livestock,” said CSISD Director of Communications Chuck Glenewinkel. “Some of them to not have the ability to do so because of lack of land to do so, or homeowner association regulations in their neighborhoods. This facility will make it possible for all CSISD students to have the opportunity to learn accountability, bookkeeping, and showmanship, and if they are successful, they are financially rewarded at the end. There is power in learning the value of hard work and the rewards that accompany it.”

The school district and VLK Architects also partnered with construction engineering firm Salas O’Brien to determine the barn’s optimal mechanical, electrical, and plumbing requirements. The facility will feature wash stations, grooming stations, and storage areas subdivided to each high school that will give students the responsibility of maintaining their own spaces.

“VLK is honored to have partnered with College Station ISD in the design of the Agricultural Barn, the first within the school district,” said VLK Principal Melissa Fleming. “We are excited by the opportunities this facility will provide for all CSISD students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Fort Collins to Convert 1980s Office Park into Junior High School

    The Liberty Common School, a charter-public school in Fort Collins, Colo., recently broke ground on an adaptive reuse project that will convert an 1980s-era office park into a 45,000-square-foot junior high school for seventh- and eighth-grade students, according to a news release.

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

Digital Edition