Kraus-Anderson Begins $3.5M Addition, Renovation for Minnesota High School

Construction firm Kraus-Anderson recently began a $3.5-million addition and renovation project for Jackson County Central Schools in Jackson, Minn. The project entails the addition of a 5,250-square-foot Career and Technical Education (CTE) center and another 2,300 square feet of renovations to the district’s high school. The project is scheduled for completion in November 2023, according to a news release.

The district partnered with JLG Architects for the project’s design. The CTE center is set to feature a Construction and Automotive Lab, as well as renovations to the existing Metal Lab. The space will feature butcher-block counters and floors of polished concrete to accommodate a wide variety of career training opportunities.

“The CTE addition is intended to enhance and expand the amazing work that is already being done at JCC Schools,” said Superintendent Barry Schmidt. “Our students will be able to explore different pathways, which will help them prepare for how classes and careers fit together, as well as college. JCC is committed to helping students succeed in an ever-changing world.”

Kraus-Anderson previously worked with the district on a $35.4-million district bond referendum that local voters passed in November 2019. The referendum covered a broad spectrum of facility replacements and improvements, as well as a brand new middle school—Jackson Country Central Middle School, which cost $26 million and covers 84,000 square feet—completed in February 2023.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.