Colorado K–12 District Breaks Ground on New High School

The Boulder Valley School District in Boulder, Colo., recently broke ground on a new facility for New Vista High School, according to local news. Funding for the project comes from a $350-million bond that voters approved last November to improve buildings district-wide. The existing New Vista High School was originally built as Baseline Junior High School in 1952.

The new facility will be built on the same site as the existing school, cover 76,000 square feet, and cost an estimated $47.2 million, according to 9News. The facility will offer better energy efficiency, reduced maintenance costs, and is expected to last for at least 70 years, said district officials. It will include amenities like a performance auditorium, flexible learning spaces, and outdoor learning spaces.

The district partnered with MOA Architects and Adolfson & Peterson (A&P) Construction for the project’s design and construction. Completion is scheduled for fall 2024, according to the district website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Universities Continue to Launch Multimillion-Dollar Campus Transformations

    What makes the current wave of campus development especially noteworthy is its emphasis on multi-use functionality and community integration. Institutions are no longer investing solely in academic or athletic facilities in isolation. Instead, they are creating destinations that blend recreation, health, housing, and event-driven economic activity.