Massachusetts Charter School Breaks Ground on New Academic Building

The Advanced Math and Science Academy Charter School in Marlborough, Mass., recently broke ground on a new 17,000-square-foot academic building, according to a news release. The facility will offer additional classroom and science lab space for the campus, which serves students in grades 6–12. The school partnered with Finegold Alexander Architects for the building’s design.

The public charter school currently owns and occupies a three-building space formerly used as an office park. The new academic facility has been designed to more closely support the school’s accelerated academic program. Phase one of the project includes both the new facility and a redesign of parking and circulation areas to improve pick-ups and drop-offs.


Rendering courtesy of Finegold Alexander Architects

“We are excited to embark on this significant partnership with AMSA to creatively address the design challenges that the school is currently facing,” said Finegold Alexander Principal and K–12 studio leader Regan Shields Ives.

According to a school news release, the new building will alleviate classroom space restrictions and feature state-of-the-art classroom technology and lab equipment. The project will also include grading for a future multipurpose events facility and gymnasium that will stand next to the academic building.

Funding for the project comes from a combination of school equity ($4 million), a tax-exempt bond ($24 million), and philanthropy ($2 million).

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.