Auburn University Breaks Ground on STEM + Agricultural Sciences Complex

Auburn University in Auburn, Ala., recently announced that construction on a new STEM and Agriculture Sciences Complex has begun, according to a news release. The new facility measures in at 285,000 square feet and will cost an estimated $184 million. The university is partnering with Hoar Construction, construction manager JE Dunn, and designers of record Goodywn Mills Cawood & Lord Aeck Sargent on the project, which has an estimated completion date of summer 2026.

The complex features three buildings connected via pedestrian bridges and a shared basement. Each building will include teaching labs with state-of-the-art technology, research labs, a teaching garden, and communal spaces, the news release reports. It will provide a centralized space for the university’s Departments of Biological Sciences; Geosciences; Mathematics and Statistics; Crop, Soils & Environmental Sciences; and more. Certain spaces will also be equipped to house aquatic animals and insects.

“We are honored to have been chosen to oversee construction of this state-of-the-art development, which is one of the highest dollar-value projects in Auburn’s history,” said Hoar Project Manager Joel Brown. “This complex is set to greatly enhance the learning experience and capabilities for Auburn’s students and will pave the way for our next generation of leaders within science, technology and agriculture. We look forward to working alongside our invaluable project partners to deliver this project on time and without any disruptions to student life.”

The news release reports that once construction is complete, the facility will aim to achieve LEED Silver Status.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition