Auburn University Breaks Ground on STEM + Agricultural Sciences Complex

Auburn University in Auburn, Ala., recently announced that construction on a new STEM and Agriculture Sciences Complex has begun, according to a news release. The new facility measures in at 285,000 square feet and will cost an estimated $184 million. The university is partnering with Hoar Construction, construction manager JE Dunn, and designers of record Goodywn Mills Cawood & Lord Aeck Sargent on the project, which has an estimated completion date of summer 2026.

The complex features three buildings connected via pedestrian bridges and a shared basement. Each building will include teaching labs with state-of-the-art technology, research labs, a teaching garden, and communal spaces, the news release reports. It will provide a centralized space for the university’s Departments of Biological Sciences; Geosciences; Mathematics and Statistics; Crop, Soils & Environmental Sciences; and more. Certain spaces will also be equipped to house aquatic animals and insects.

“We are honored to have been chosen to oversee construction of this state-of-the-art development, which is one of the highest dollar-value projects in Auburn’s history,” said Hoar Project Manager Joel Brown. “This complex is set to greatly enhance the learning experience and capabilities for Auburn’s students and will pave the way for our next generation of leaders within science, technology and agriculture. We look forward to working alongside our invaluable project partners to deliver this project on time and without any disruptions to student life.”

The news release reports that once construction is complete, the facility will aim to achieve LEED Silver Status.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.