Auburn University Breaks Ground on STEM + Agricultural Sciences Complex

Auburn University in Auburn, Ala., recently announced that construction on a new STEM and Agriculture Sciences Complex has begun, according to a news release. The new facility measures in at 285,000 square feet and will cost an estimated $184 million. The university is partnering with Hoar Construction, construction manager JE Dunn, and designers of record Goodywn Mills Cawood & Lord Aeck Sargent on the project, which has an estimated completion date of summer 2026.

The complex features three buildings connected via pedestrian bridges and a shared basement. Each building will include teaching labs with state-of-the-art technology, research labs, a teaching garden, and communal spaces, the news release reports. It will provide a centralized space for the university’s Departments of Biological Sciences; Geosciences; Mathematics and Statistics; Crop, Soils & Environmental Sciences; and more. Certain spaces will also be equipped to house aquatic animals and insects.

“We are honored to have been chosen to oversee construction of this state-of-the-art development, which is one of the highest dollar-value projects in Auburn’s history,” said Hoar Project Manager Joel Brown. “This complex is set to greatly enhance the learning experience and capabilities for Auburn’s students and will pave the way for our next generation of leaders within science, technology and agriculture. We look forward to working alongside our invaluable project partners to deliver this project on time and without any disruptions to student life.”

The news release reports that once construction is complete, the facility will aim to achieve LEED Silver Status.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition