Kennesaw State University Breaks Ground on New STEM Facility

Kennesaw State University’s Marietta Campus recently broke ground on a new Interdisciplinary STEM Building (ISTEM) on its campus, according to university news.  The facility will measure 70,000 square feet and feature both research and teaching space across a variety of disciplines. Completion is scheduled for fall 2025.

At a groundbreaking ceremony on Feb. 2, KSU President Kathy Schwaig commented, “As an institution that's working to build our research infrastructure, this building is going to be a key component to our research mission. We solve problems not within disciplines, but across disciplines and so we will see advancements happen out of these laboratories that impact all the disciplines that we have on this campus and on our Kennesaw Campus such as business, the arts, the humanities, health, science and education.”

Amenities will include wet, dry, high-bay, cybersecurity research, teaching, and chemistry- and biology-based teaching labs, as well as classrooms and private study areas. It will also increase opportunities for student competition teams like the Aerial Robotics Team, the news release reports.

“I speak on behalf of the KSU Marietta Campus student body when I say that we are absolutely thrilled and thankful to have the ISTEM building here,” said KSU mechanical engineering student and President’s Parliament Student Ambassador Nick Farinacci. “We are incredibly grateful to those who made it possible. The ISTEM building will be such an amazing resource for our students and a new hub of innovation and learning.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.