APM Steam to Offer Steam Trap Surveys to Colleges and Universities

American Plant Maintenance (APM Steam) recently announced the launch of steam trap survey services, which a news release reports can document the operational status of and provide repair recommendations for steam traps in a facility’s steam system. The survey can increase operational integrity, energy efficiency, and safety in a steam distribution system. The process creates a full inventory of steam traps, uncovers any issues that prevent the delivery of heat and removal of condensation, and can identify failing traps, according to the news release.

The surveys use ultrasound and temperature differentials to test and document the traps’ operational status. Evaluated elements include isolation valves, inlet strainers, strainer blowdown valves, outlet check valves, trap station bypasses, test valves, and sight glass flow indicators. It also evaluates safety features that allow technicians to perform maintenance without exposure to live steam flow.

The final data offers “a complete trap inventory and extensive system information in a detailed report outlining findings and recommendations, a synopsis of results, and a return-on-investment calculation that compares replacement costs with losses associated with failed traps. The report also includes trap application problems and specific recommendations for trap and trap station improvements,” according to the news release.

The survey also provides a return-on-investment calculation incorporating the cost of the survey, any necessary replacement steam traps, and the estimated cost of labor to install them. These costs are presented alongside the potential financial losses of traps found to be failing or leaking. Finally, it details trap application problems and any specific recommendations for trap and trap station improvements.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • Rush-Henrietta Central School District’s Sperry High School

    A New Perspective: Using Adaptive Reuse Concepts in K-12 Planning

    In the face of increasing pressures on construction timelines, budgets, and material availability, the renovation and reuse of pre-existing structures for new purposes can help bridge the gap between modern school programming and outdated school infrastructure.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition