Skanska USA Completes Two K–12 Projects for Florida School District

Construction and development firm Skanska USA recently announced that it has completed two projects for Hillsborough County Public Schools in Tampa, Fla., according to a news release. The projects include a $47-million campus conversion at Collins PK–8 School and a $12-million upgrade to the athletic complex at Chamberlain High School. The purpose was to address recent demand in the region for K–12 construction to meet growing student populations.

The conversion at Collins PK–8 involved the addition of a 70,000-square-foot classroom building and an additional 30,000 square feet of additions across six other buildings on campus. The facility previously served as an elementary school but will now offer capacity and services for students up to eighth grade. New amenities include 1,400 new student stations, a modernized media center, specialized science classrooms, and group learning spaces, the news release reports.

The campus also features “a multipurpose room with a stage for student performances, and a dedicated music/band room equipped with the latest technology for students to explore their musical abilities. The conversion also includes essential spaces such as teacher offices, an administrative suite, a new gymnasium with locker rooms, and a new football field,” according to the news release.

For the Chamberlain High School athletic complex, upgrades include a new football field and track featuring artificial turf and a rubberized track; new bleachers, fencing, and school sign; interior and exterior gym renovations like flooring resurfacing, window replacement, painting, and an upgraded electrical system. The existing locker rooms were converted into a training room, while the former field house became the new locker rooms.

“We’ve cultivated a longstanding partnership with Hillsborough County Public Schools in creating transformative projects throughout the region," said Daniel Abou-Jaoude, vice president and account manager at Skanska USA. “We understand the importance of staying at the forefront of K-12 constructability to ensure we’re prioritizing usability and functionality to meet the evolving needs of educators and students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.

  • Singlewire Software Report Reveals Gaps in K–12 School Entrance Security

    Single Software recently released its first-ever School Entrance Security Report based on more than 500 responses from U.S. school staff members. According to a news release, the findings highlight a gap between K–12 leaders’ wishes for school safety and how safe the schools actually are, as well as the challenges facing students and staff in that goal.

Digital Edition