Colburn School in Los Angeles Breaks Ground on Campus Expansion

The Colburn School in Los Angeles, Calif., recently held a groundbreaking ceremony for a 100,000-square-foot expansion designed by world-renowned architect Frank Gehry, according to a news release. The Colburn School is a music and dance education and performance institute that offers services to people of all ages, from 7-month-olds to adults. The school’s new building, the Colburn Center, will increase the school’s training and performance facilities and stand adjacent to the existing Grand Avenue campus.

“The Colburn Center will be a game changer, stepping up everything we do for the school’s own community, for our peer organizations that make the LA artistic ecosystem so vibrant, and for the public that we look forward to welcoming,” said Colburn School President and CEO Sel Kardan. “At Colburn, making performances accessible to LA audiences is as much a part of our core mission as making first-rate music and dance education available to everyone. These are the same values we see in the wonderful design by Frank Gehry: artistic excellence at the highest level, combined with a deep love for the dynamism and diversity that animate life in a great city.”

According to the news release, the Colburn Center will stand alongside the Walt Disney Concert Hall and The Grand complex—also designed by Gehry—to form the largest concentration of the architect’s work in the world.

Principal design features include a 1,000-seat theater performance space, four studios for dance classes and rehearsal, and other teaching and support facilities, according to a project fact sheet, as well as a natural-light-filled entrance and gardens at street and rooftop levels. All performance and rehearsal spaces were designed to accommodate a wide variety of potential configurations and productions.

“This is a long time coming, and I am so grateful for everyone who helped make it possible,” said Gehry. “For me, this building is very special. It adds significant opportunity for growth in music, music education, and collaboration inside of Colburn and with the other arts institutions in LA. I really believe it will unlock untold riches in the cultural community here in LA and I am honored to be a part of it.”

The Colburn School is partnering with McCarthy Building Companies for the project’s construction, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • New Campus Stadiums Evolve Beyond Sports into Community Assets

    New campus planning documents reveal an abundance of high interest in new stadiums, or renovations and repurposing projects for existing facilities. Many universities, in fact, are developing campus complexes with new stadiums as a draw for retail, hotels, and student housing. Multipurpose facilities with high-end features are being designed to attract large sports events of various types, concerts, and other university functions.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Washington University School of Medicine Completes $165M Expansion Project

    The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

Digital Edition