NRC to Issue Permit for Molten Salt Reactor at Abilene Christian University

The Nuclear Regulatory Commission (NRC) recently announced its intention to complete a safety assessment and construction permit issuance by Sept. 30 for a Molten Salt Research Reactor (MSRR) funded by Natura Resources on the campus of Abilene Christian University, according to a news release. The MSSR is the first liquid-fueled molten salt reactor design that the NRC has ever reviewed, and an environmental assessment was completed in March.

The Nuclear Energy eXperimental Testing Lab (NEXT) Lab at ASU partnered with the University of Texas at Austin, Texas A&M University, and the Georgia Institute of Technology—alongside the Natura Resources Research Alliance—toward the licensing and deployment of the reactor.

“The environmental assessment and upcoming completion of the safety evaluation for a construction permit are significant steps forward in the first deployment of the Natura MSR-1 system,” said Natura Resources founder and president Doug Robison. “This deployment at ACU will not only demonstrate successful licensure of a liquid-fueled molten salt reactor but will provide critical operational data that will help us meet the world's growing energy needs.”

The construction permit, expected in September, will allow the team to move forward with construction and deployment. The reactor serves as the first deployment of the Natura MSR-1, a one-megawatt thermal molten salt reactor system.

“This groundbreaking research has applications not only for clean energy but for clean water and the production of needed medical isotopes. We're thrilled to see how this technology will bless people around the world,” said ACU president Dr. Phil Schubert.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • abstract representation of hybrid learning environment

    The Permanence of Change: Why Hybrid Is the New Baseline

    Hybrid learning is here to stay, and it's reshaping how campus spaces function.

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.

Digital Edition